Operations ChampionLogged in as Sarah Jenkins
Master resource balancing, 90-day roll-off radar, travel dispatch, and timesheet approvals.
Active Perspective: Operations Admin
Operations Overview
Real-time project delivery, engineer utilization, and billing gates.
Active Projects
6 Projects
$ 18,400,000 Total Value
Team Utilization
91.5%
● 1 Engineer Overallocated
Ready to Invoice
$ 1,850,000
2 Milestones at 100%
Field Deployments
2 On-Site
In-office design frozen (0.0h)
Capacity Limit Reached: Dr. Aris Thorne (125% allocated)+10.0h Over
Assigned 30.0h on FS Bioenergia C-101 and 20.0h on GreenField (50h total vs 40h base). Rebalance non-fungible chemical tasks to prevent project delay.
Active Projects Portfolio
Fixed-fee technology licensing packages
FS-500 // Mato Grosso, Brazil
FS Bioenergia Phase 3 (500M L/yr)
Lead P.E.: Victor Szudejko • Phase: Detailed Engineering
BE8-350 // Passo Fundo, Brazil
Be8 Passo Fundo Biofuel Complex
Lead P.E.: Sarah Jenkins • Phase: HAZOP & Closeout
INP-800 // Sinop, Brazil
INPASA Sinop Stage 4 Mega-Refinery
Lead P.E.: Victor Szudejko • Phase: Distillation Modeling
Pending Milestone Invoices
Deliverable completion and P.E. approval gates
INV-2026-088 // FS Bioenergia
FEL-3 Process Design Package Completion
Deliverables 100% • P.E. Signed
$ 680,000
INV-2026-089 // GreenField Ethanol
VHQ™ Distillation Reboiler Thermal Spec
Deliverables 100% • Awaiting P.E. Seal
$ 420,000